Bridgeport ISD Bond 2023

Proposition A

The projects in Proposition A are designed to help increase safety and security across the district, provide maintenance and capital improvements for aging facilities, renovate the oldest school building in the district (the 66-year-old Bridgeport Middle School) and build a second K-5 elementary school to replace Bridgeport Intermediate School. The scope of the BMS renovations and the new auditorium for Bridgeport High School has been revised since the May election.

$128 Million

Take a deeper look at each of the facility improvement projects on the ballot:

REVISED EST. PROJECT COST: $15.5 MILLION

Projected Opening Fall 2026

  • General Deferred Maintenance
  • Roof Replacement
  • Plumbing and Foundation Repair
  • Exterior Repairs
  • ADA Improvements

EST. PROJECT COST: $4.8 MILLION

  • Security Vestibule Upgrades (all campuses)
  • Door Hardware & Lock Upgrades
  • Window Film – Entry Resistant
  • Access Control Additions
  • Surveillance Camera Upgrades
  • Vehicle Gates and Road Bumps (all campuses)
  • Vehicle Tag/Decal System
  • Radio Interoperability (district-wide)
  • ADA compliance at BMS (ramp)
  • Intercom System Upgrades (secondary)
  • Fencing

REVISED EST. PROJECT COST: $16 MILLION

  • Flooring Improvements
  • Roofing System Improvements
  • Interior/Exterior Improvements
  • HVAC Improvements

REVISED EST. PROJECT COST: $5.5 MILLION

Renovations

Career Tech renovations include improvements to:

  • automotive technology
  • agricultural mechanics
  • animal science
  • horticulture/plant science
  • production design studio
  • business-industry classrooms to support current programs

Campus Specifics

Currently, 85% of BHS students are enrolled in at least one Career Tech course and several programs have waiting lists of students wanting to participate.

REVISED EST. PROJECT COST: $60.1 MILLION

Projected Opening: Fall 2026

Multiple Potential Sites

  • Replaces a 54-year old Intermediate campus where safety and security are a priority in design and construction
  • Relieves Bridgeport Elementary Projected Enrollment Capacity
  • Provides the district with two, Kindergarten-Grade 5 campuses
  • Capacity for 800 students

REVISED EST. PROJECT COST: $24.1 MILLION

Projected Opening: Summer 2025

  • Provides more space for classroom instruction
  • Provides more space for all student programs
  • Provides more space for campus programs
  • Provides ability to host multiple events at the same time

Includes Capital Improvements to:

  • BHS Band Front Ensemble Sound System
  • BHS Mariachi Microphone/Sound System
  • BMS/BHS Band Hall Wired for Sound
  • BHS Dance Room Sound & Floor
  • BHS Commons Sound System
  • Marching Uniforms and Instruments

 

EST. PROJECT COST: $2 MILLION

NEW SCHOOL BUSES TO MAINTAIN A SAFE AND MODERN FLEET

BISD owns 26 school buses

  • 46% are over 12 years of age
  • 58% will be over lifecycle by 2025-26
  • The bond proposes purchasing two replacement buses per year for the next 10 years.